Betekenis van:
power service

power service
Zelfstandig naamwoord
  • gas- en elektriciteitsbedrijf; gas- en elektriciteitsmaatschappij
  • a public utility that provides electricity

Synoniemen

Hyperoniemen


Voorbeeldzinnen

  1. I am come to offer what service may be in my power.
  2. Service is required when the apparatus has been damaged in any way, such as power-supply cord or plug damaged, liquid has been spilled or objects have fallen into the apparatus, this apparatus has been exposed to rain or moisture, does not operate normally, or has been dropped.
  3. Additional technical requirements for power-operated service doors
  4. Maintenance including airframe structure, power plant and electrical systems before release to service
  5. The power source for providing the parking brake effort shall be derived from a different power source than the automatic service/emergency brake.
  6. The power source for providing the parking brake effort shall be derived from a different power source than the Automatic Service/Emergency brake.
  7. Service braking: application of full service braking shall result in a traction cut-off without an automatic restoration of traction power.
  8. Former Minister of Energy and Power Development (former Minister of Public Service, Labour and Social Welfare), born 7.5.1950
  9. Former Minister of Energy and Power Development (former Minister of Public Service, Labour and Social Welfare), born 7.5.1950.
  10. Where a power-operated service door is held closed only by the continued application of the power supply a visual warning device shall be provided to inform the driver of any failure in the power supply to the doors.
  11. the Power sector, comprising the Power Turbo-Systems subsector (gas and steam turbines) with an estimated EUR 3,6 billion turnover, the Power Service subsector with an estimated EUR 3,1 billion turnover and the Power Environment subsector (boilers and hydro) with an estimated EUR 3,1 billion turnover;
  12. Budapest power plant argues that it can also be considered that it is actually the Budapest power plant itself that has to discharge a public service obligation imposed on it by its PPAs.
  13. AC power supply systems shall be designed to permit the use of regenerative braking as a service brake, able to exchange power seamlessly either with other trains or by any other means.
  14. The net power of the engine measured by the technical service may differ by ± 2 % from the net power specified by the manufacturer, with a tolerance of 1,5 % for the engine speed.
  15. Such test runs shall be performed with suitable rolling stock of known characteristics allowing for verifications in conditions that may occur during service (e.g., train speed, traction power).